Cycleway Case Study

Project Overview

A leading UK Charity

Transforming a disused rail line into an area suitable for a new cycle path

Cycleway Case Study
Cleared corridor between trees with grass and vehicle tracks along the ground
View along a cleared tree-lined corridor with cut vegetation at the edges
Operatives using wood chippers along a narrow corridor through trees

We are experts at handling complex clearance operations in difficult terrain

In this case study, see how we collaborated with a top UK charity to remove 7km of disused railway line, addressing ecological constraints, public safety hazards, and access restrictions to help turn the route into a bridal and safe cycling route.

The Challenge

A renowned UK charity hired PB Forestry to clear 7 km of a disused railway line for conversion into a shared cycle and bridal way. Steep slopes, embankments, existing infrastructure like bridges, and a lack of wireless connection points along the linear site were among the logistical and safety challenges the project brought. The danger of coming into contact with people who had started utilising the disused line as a makeshift walkway added to these challenges. In order to comply with safety and environmental standards, the work also required close consultation with local authorities.

How PB Forestry Provided Solution?

PB Forestry used a specialised set of small equipment, such as tracked wood chippers, powered hand tools, and a mini-tree shear and mulching head, to deal with the challenging terrain and a few access points. In compliance with a bespoke Method Statement (RAMS) made to fit the client’s site characteristics and the ecological restrictions set by local authorities, the work was completed in progressive parts between access points. Our team made sure that there was as little disruption to the environment as possible by keeping a laser-like concentration on efficiency and safety.

Result

The clean up was carried out incident-free, quickly, and safely. The client was allowed to proceed with development of a safe, accessible walking, wheeling, and cycling route after we resolved the site’s access and safety issues. This project shows that PB Forestry can complete complex specialist construction projects while maintaining strict safety and environmental regulations.

Attach any files that may help support your enquiry, e.g. maps, plans, photos etc.

Companies we have worked with

Amey plc
Balfour Beatty
EDF Energy
Forestry England
Galliford Try
Ground Control
High Speed 2 (HS2)
CEMEX
Butterfly Conservation
National Highways
The National Forest
Warwickshire Wildlife Trust
University of Warwick
BMW
Fisher German